nikki asked:


We have the option to do it now through the builder, or take the standard flooring (carpet) and have the tile put in by a contractor after the house is done. In your price estimates please consider that we would need removal of existing carpet flooring if we went with a contractor…
Hayward, CALIFORNIA

RODOCKER
Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google
  • blinkbits
  • BlinkList
  • De.lirio.us
  • Fark
  • Faves
  • Fleck
  • Furl
  • LinkedIn
  • Live
  • Ma.gnolia
  • MySpace
  • Propeller
  • description
  • Spurl
  • StumbleUpon
  • Technorati
  • ThisNext
  • TwitThis
  • Yahoo! Buzz
  • YahooMyWeb
  • Yigg

Comments

Tedruski on 20 November, 2008 at 3:24 am #

The builder you will neet to put down the builder you do dont have the cement board the tile labor.
The tile labor at 22000 for not wanting the color allow about 250 per sq foot so you are looking at around 300 per sq.